The Assembly and Installation of Solar Powered Public Street Lights (PJU) at Panti Asuhan Putri Aisyiah Dau Malang
DOI:
https://doi.org/10.58879/ijcep.v1i2.13Abstract
The paper discusses the problem of increasing security for residents in panti asuhan putri aisiyah dau malang area, Jl. Engineer Soekarno II no. 4 RT 01 RW 01 Dadaprejo Village, Junrejo District, Malang Regency. One of the most important is lighting. The installation of public street lighting is still minimal, so it is far from meeting security and safety standards. In order to ensure the availability of safe and reliable street lighting, training on the assembly of solar-powered street lighting (PJU) was conducted at panti asuhan putri aisiyah dau malang, Jl. Engineer Soekarno II no. 4 RT 01 RW 01 Dadaprejo Village, Junrejo District, Malang Regency. Prior to the assembly process for street lighting, a brief training was conducted on the assembly of solar-powered PJU lampposts and their installation, for residents at panti asuhan putri aisiyah dau malang Jl. Engineer Soekarno II no. 4 RT 01 RW 01 Dadaprejo Village, Junrejo District, Malang Regency., so that he has skills that can be developed. The result of the PKM is an increase in the knowledge and skills of the residents of the panti asuhan putri aisiyah dau malang in the field of fabrication and installation of solar-powered PJU lights. In addition, the installation of 3 Solar Powered PJU lights that are safe and reliable, and have an impact on increasing environmental security and residents' activities at night in the panti asuhan putri aisiyah dau malang.
Keywords: Public Street Lighting, Solar Cell Lamps, Lamp Posts
References
Ali, A. S., Zanzinger, Z., Debose, D., & Stephens, B. (2016). Open Source Building Science Sensors (OSBSS): A low-cost Arduino-based platform for long-term indoor environmental data collection. Building and Environment, 100, 114-126.
A. J. B. Siqueira et al., “Energi & Kelistrikan,” J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2019.
C. R. Sandro Putra, “Perencanaan Pembangkit Listrik Tenaga Surya Secara Mandiri Untuk Rumah Tinggal,” Semin. Nas. Cendekiawan, vol. 6, no. 1, p. 23.4, 2016.
Kementerian ESDM, “Jurnal Energi,” 2016, [Online]. Available: https://www.esdm.go.id/assets/media/content/FIX2_Jurnal_Energi_Edisi_2_17112016(1).pdf.
Liu, G. (2014). Sustainable feasibility of solar photovoltaic powered street lighting systems. International Journal of Electrical Power & Energy Systems, 56, 168-174.
Li, D. H., Cheung, K. L., Wong, S. L., & Lam, T. N. (2010). An analysis of energy-efficient light fittings and lighting controls. Applied Energy, 87(2), 558-567.
M. Sahori, “Perancangan Pembangkit Listrik Tenaga Surya Sebagai Catu Daya Lampu Lalu Lintas Di Pekanbaru,” Skripsi, 2011.
M. Hidayat, A. T. Ismail, P. Studi, T. Elektro, F. Teknik, and U. M. Makassar, “Perancangan Penerangan Jalan Umum Tenaga Surya ( Solar Cell ) Untuk Alternatif Penerangan Kampus,” 2020.
Rajab, Z., Khalil, A., Amhamed, M., & Asheibi, A. (2017, March). Economic feasibility of solar powered street lighting system in Libya. In 2017 8th International Renewable Energy Congress (IREC) (pp. 1-6). IEEE.
Siqueira et al., “Energi & Kelistrikan,” J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2019.
Sandro Putra, “Perencanaan Pembangkit Listrik Tenaga Surya Secara Mandiri Untuk Rumah Tinggal,” Semin. Nas. Cendekiawan, vol. 6, no. 1, p. 23.4, 2016.
P. W. Gautama, F. Ketenagalistrikan, and D. A. N. Energi, “Perencanaan Pembangkit Listrik Tenaga Surya ( Plts ) Sistem Off Grid Dengan Kapasitas 2 Kwp Pada Instalasi Menara Suar Bulukumba Perencanaan Pembangkit Listrik Tenaga Surya ( Plts ) Sistem Off Grid Dengan Kapasitas 2 Kwp Pada Instalasi Menara Suar Bulukum,” 2021.
[Bappenas, “Indonesia PPP Handbook 2018,” pp. 1–176, 2018, [Online]. Available: https://www.bappenas.go.id/files/PPP Book/PPP Book 2018 FINAL.pdf.
PT PLN, “35,000 MW for Indonesia (35.000 MW untuk Indonesia),” PT PLN, 2015, [Online]. Available: http://www.pln.co.id/?p=12187.
P. W. Gautama, F. Ketenagalistrikan, and D. A. N. Energi, “Perencanaan Pembangkit Listrik Tenaga Surya ( Plts ) Sistem Off Grid Dengan Kapasitas 2 Kwp Pada Instalasi Menara Suar Bulukumba Perencanaan Pembangkit Listrik Tenaga Surya ( Plts ) Sistem Off Grid Dengan Kapasitas 2 Kwp Pada Instalasi Menara Suar Bulukum,” 2021.
Published
Issue
Section
Copyright (c) 2021 Gumono, Sugeng Hadi Susilo, Agus Setiawan, Asrori

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.